Your parking lot is a power plant waiting to happen.

Elevated solar trackers for casinos, resorts and Tribal facilities.
The Nation owns the system outright, with no PPA, no tax-equity partner and no third-party interest.

50–70%

More energy per panel than fixed-tilt solar

14’

(4.3 m) minimum clearance for equipment and livestock

50%

of project cost returned as a federal Direct Pay credit

30 yr

structural warranty

The Power is Yours

Keep every kWh

100% Tribal ownership. Every kWh of renewable energy, and every credit it earns, is the Nation's to use, store, sell or retire. Power is generated and controlled on Tribal land, reducing dependence on outside utilities.

Built over the lot, not instead of it

Each tracker stands on a single steel pole, so every parking space stays in use. Cars parked beneath can run 15–20°F cooler on summer afternoons. Directionally drilled conduit and pier foundations keep asphalt disturbance to a minimum.

Room to work

With proven battery storage and bidirectional EV charging, Stracker arrays can form microgrids that carry critical resort and community loads through grid outages. Arrays, storage and charging can be added as needs change.

See some of our past projects

Evergreen Federal Bank
Ashland, OR - canopy lighting after dark

Work Sharp Tools
Ashland, OR

TC Chevrolet
Ashland, OR - Shade for Cars Below

Franz Bakery
White City, OR

The Economics

Owned Outright, Paid Back in Cash

Tribal governments can take the federal clean-energy credit as a direct cash payment through the IRC §6417 Direct Pay election. No tax appetite or outside investor is needed, so nothing about the project is leased to anyone else.

ITC Credit Stack Chart — Squarespace embed preview
Investment tax creditDomestic content (U.S.-built steel trackers)Tribal-land bonus
~$2/WTypical turnkey cost after credits, including permitting, site work, equipment, installation and interconnection.
~5¢Per kWh levelized cost of electricity (LCOE) over the minimum 30-year life of the project.
12/31/27Projects must be placed in service by this date to capture the full credit stack.